{"id":4965,"date":"2024-11-05T16:00:34","date_gmt":"2024-11-05T13:00:34","guid":{"rendered":"https:\/\/offshorewind.lt\/?p=4965"},"modified":"2025-02-03T12:28:23","modified_gmt":"2025-02-03T09:28:23","slug":"litgrid-atnaujino-isankstines-prijungimo-salygas-jurinio-vejo-elektriniu-parko-konkursui","status":"publish","type":"post","link":"https:\/\/offshorewind.lt\/en\/litgrid-atnaujino-isankstines-prijungimo-salygas-jurinio-vejo-elektriniu-parko-konkursui\/","title":{"rendered":"Litgrid has updated preliminary conditions for the connection of offshore wind farms to the electricity transmission grid"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4965\" class=\"elementor elementor-4965\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-7b688159 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7b688159\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9c11249\" data-id=\"9c11249\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-18745d9c elementor-widget elementor-widget-text-editor\" data-id=\"18745d9c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"translation-block\"><strong>In order for Lithuania to develop offshore wind parks in the Baltic Sea and to reduce the country's dependence on electricity imports and fossil fuels, preparatory work is underway for the tender in which the developer of the park will be selected.<\/strong> <strong>The electricity transmission grid operator Litgrid has announced the updated preliminary conditions for the connection of offshore wind farms in the maritime area to the electricity transmission grid.<\/strong><\/p><p>As the tender approaches, the preliminary connection conditions have been updated. They set the essential requirements for the future developer, which will have to be implemented in order to connect the wind farm to the electricity transmission network. The planned connection point of the offshore wind farm is located in the Darb\u0117nai substation.<\/p><p>The Government has confirmed that the tender for the development of the second 700 MW offshore wind farm in Lithuania will be announced on November 18 of 2024.<\/p><p class=\"translation-block\">The institution organizing the competition is the National Energy Regulatory Council (NERC). All tender documents and terms and conditions can be found on the NERC website: <a href=\"https:\/\/www.vert.lt\/Puslapiai\/baneriai\/Jurines-teritorijos-naudojimo-atsinaujinancius-energijos-isteklius-naudojaniu-elektriniu-pletrai-ir-eksploatacijai-konkurs.aspx\" target=\"_self\">NERC Tenders for the use of marine territory for the development and operation of power plants using renewable energy resources<\/a><\/p><p>The terms of the tender for the second offshore wind farm park provide that the developer will be able to choose to develop the park both without and with state support, as well as compete for the amount of support requested - for all or only part of the electricity produced. In the near future, the National Energy Regulatory Council will announce the highest and lowest prices.<\/p><p>The successful tenderer will be required to contribute at least EUR 5 million for environmental protection in the Lithuanian maritime area. Once the offshore wind farm is built, the developer will be obliged to make an annual contribution (EUR 1 per 1 MWh of electricity generated) to the local communities. Preliminary estimates suggest that this could amount to around EUR 3 million per year.<\/p><p>The park would provide a quarter of Lithuania's current electricity needs. The area of \u200b\u200bthe territory planned for the park in the Baltic Sea is about 136.39 km2 and is about 30 kilometers from the coast. In total, Lithuania is planning two offshore wind parks with a total capacity of 1.4 GW.<\/p><p class=\"translation-block\">In preparation for the tender, the Ministry of Energy approved <a href=\"https:\/\/offshorewind.lt\/en\/jurinio-vejo-parkai-patvirtinta-jungciu-su-sausuma-koncepcija\/\" target=\"_self\">the concept of the development plan<\/a> for the engineering infrastructure at sea and on land, the work on the preparation of concrete solutions for the development plan continues, the environmental impact assessment report of the offshore wind power park was approved, as well as geophysical and geotechnical investigations of the seabed in the area intended for the park, measured wind speed and other hydrometeorological parameters.<\/p><p>Lithuania is rapidly growing local electricity generation \u2013 electricity production has grown from 30 to almost 70 percent over the last few years, and that is solely due to the development of renewable energy.<\/p><p><em>Preparatory works for offshore wind farm development and related infrastructure No. 03-004-P-0001<\/em><\/p><p>Funded by the European Union NextGenerationEU<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-0c7003c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0c7003c\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-1e1f900\" data-id=\"1e1f900\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-7e7ce05 elementor-widget elementor-widget-image\" data-id=\"7e7ce05\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"209\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1024x267.png\" class=\"attachment-large size-large wp-image-4591\" alt=\"\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1024x267.png 1024w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-300x78.png 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-768x200.png 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1536x401.png 1536w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-2048x535.png 2048w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-18x5.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-22a0ece\" data-id=\"22a0ece\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-7141a6b elementor-widget elementor-widget-image\" data-id=\"7141a6b\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"284\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1024x364.png\" class=\"attachment-large size-large wp-image-4555\" alt=\"\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1024x364.png 1024w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-300x107.png 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-768x273.png 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1536x546.png 1536w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-18x6.png 18w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB.png 1832w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Lietuvai siekiant vystyti j\u016brinio v\u0117jo elektrini\u0173 parkus Baltijos j\u016broje ir ma\u017einti \u0161alies priklausomyb\u0119 nuo elektros importo ir i\u0161kastinio kuro, vyksta paruo\u0161iamieji darbai konkursui, kuriame bus atrinktas parko vystytojas. Elektros perdavimo sistemos operator\u0117 \u201eLitgrid\u201c paskelb\u0117 atnaujintas j\u016brinio v\u0117jo elektrini\u0173 parko i\u0161ankstines prijungimo prie elektros perdavimo tinklo s\u0105lygas. Art\u0117jant konkursui, atnaujintos i\u0161ankstin\u0117s prijungimo s\u0105lygos. Jose nustatyti esminiai [&hellip;]<\/p>","protected":false},"author":4,"featured_media":4438,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-4965","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-20"],"_links":{"self":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/comments?post=4965"}],"version-history":[{"count":0,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4965\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media\/4438"}],"wp:attachment":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media?parent=4965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/categories?post=4965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/tags?post=4965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}