{"id":4534,"date":"2024-01-02T11:25:54","date_gmt":"2024-01-02T08:25:54","guid":{"rendered":"https:\/\/offshorewind.lt\/?p=4534"},"modified":"2025-01-02T13:58:16","modified_gmt":"2025-01-02T10:58:16","slug":"litgrid-atnaujino-jurinio-vejo-elektriniu-parku-isankstines-prijungimo-salygas","status":"publish","type":"post","link":"https:\/\/offshorewind.lt\/en\/litgrid-atnaujino-jurinio-vejo-elektriniu-parku-isankstines-prijungimo-salygas\/","title":{"rendered":"Litgrid has updated the preliminary offshore wind farm connection conditions"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4534\" class=\"elementor elementor-4534\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-7b688159 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7b688159\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9c11249\" data-id=\"9c11249\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-18745d9c elementor-widget elementor-widget-text-editor\" data-id=\"18745d9c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>We would like to notify you that, adhering to the evaluation of the engineering infrastructure development plan concept for the project of special national importance, which was prepared by the order of the Ministry of Energy and made public on November 17, 2023, and taking into account the potential for interactions between AB Litgrid's infrastructure and infrastructure corridors planned for offshore wind grid development, the transmission system operator, AB Litgrid has updated and announced the preliminary connection conditions for those participating in the planned offshore wind farm tender, which is scheduled to be announced on January 15, 2024. <\/strong><\/p><p>The preliminary connection conditions have been supplemented with a new Appendix No. 4, which outlines the specifications for interactions with AB Litgrid's infrastructure.<\/p><p><a href=\"https:\/\/www.litgrid.eu\/uploads\/files\/dir707\/dir35\/dir1\/19_0.php\" target=\"_blank\" rel=\"noopener\">Preliminary conditions for the connection of offshore wind farms in the maritime area to the electricity transmission grid (Phase II \u2013 for the winter tender)<\/a><\/p><p><em>Preparatory works for offshore wind farm development and related infrastructure No. 03-004-P-0001<\/em><\/p><p>Funded by the European Union NextGenerationEU<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-0c7003c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0c7003c\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-1e1f900\" data-id=\"1e1f900\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-7e7ce05 elementor-widget elementor-widget-image\" data-id=\"7e7ce05\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"209\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1024x267.png\" class=\"attachment-large size-large wp-image-4591\" alt=\"\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1024x267.png 1024w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-300x78.png 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-768x200.png 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-1536x401.png 1536w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-2048x535.png 2048w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/LT_Finansuoja_Europos_Sajunga_RGB_POS-18x5.png 18w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-22a0ece\" data-id=\"22a0ece\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-7141a6b elementor-widget elementor-widget-image\" data-id=\"7141a6b\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"284\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1024x364.png\" class=\"attachment-large size-large wp-image-4555\" alt=\"\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1024x364.png 1024w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-300x107.png 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-768x273.png 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-1536x546.png 1536w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB-18x6.png 18w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2024\/01\/NKL-Logo_Horizontal-RGB.png 1832w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Informuojame, kad \u012fvertinus LR energetikos ministerijos u\u017esakymu parengt\u0105 ir 2023 m. lapkri\u010dio 17 d. pavie\u0161int\u0105 ypatingos valstybin\u0117s svarbos projekto in\u017einerin\u0117s infrastrukt\u016bros vystymo plano koncepcij\u0105 ir strateginio pasekmi\u0173 aplinkai (SPAV) vertinimo ataskait\u0105 ir atsi\u017evelgiant \u012f tai, kad j\u016brinio v\u0117jo elektrini\u0173 tinkl\u0173 koridori\u0173 alternatyvos gali s\u0105veikauti su AB \u201eLitgrid\u201c infrastrukt\u016bra, perdavimo tinklo operatorius \u2013 AB \u201eLitgrid\u201c atnaujino [&hellip;]<\/p>","protected":false},"author":4,"featured_media":4414,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-4534","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-20"],"_links":{"self":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/comments?post=4534"}],"version-history":[{"count":0,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4534\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media\/4414"}],"wp:attachment":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media?parent=4534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/categories?post=4534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/tags?post=4534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}