{"id":4403,"date":"2023-10-17T11:52:09","date_gmt":"2023-10-17T08:52:09","guid":{"rendered":"https:\/\/offshorewind.lt\/?p=4403"},"modified":"2023-10-17T11:59:03","modified_gmt":"2023-10-17T08:59:03","slug":"antraji-juros-vejo-elektriniu-parko-konkursa-planuojama-skelbti-2024-metu-sausio-15-diena","status":"publish","type":"post","link":"https:\/\/offshorewind.lt\/en\/antraji-juros-vejo-elektriniu-parko-konkursa-planuojama-skelbti-2024-metu-sausio-15-diena\/","title":{"rendered":"The second offshore wind farm tender is expected to be launched on 15 January 2024"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4403\" class=\"elementor elementor-4403\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-7b688159 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7b688159\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9c11249\" data-id=\"9c11249\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-18745d9c elementor-widget elementor-widget-text-editor\" data-id=\"18745d9c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Following the European Commission\u2019s approval of the support scheme for offshore wind farm development, and after public consultations with market participants, the Ministry of Energy proposes to launch the second offshore wind farm tender on 15 January 2024. The proposal by the Ministry of Energy still needs to be approved by the Government.<\/strong><\/p><p>\u201cOffshore wind farm development is gaining momentum and we are laying the foundations for a second offshore wind farm tender. We aim for two wind farms to provide up to half of Lithuania\u2019s current electricity demand, which would be a significant increase in national electricity generation\u201d, said Daiva Garbaliauskait\u0117, Vice-Minister of Energy.<\/p><p>The Ministry of Energy is planning two 1.4 GW offshore wind farms in Lithuania\u2019s Baltic Sea near Palanga. These farms could generate around 6 TWh of green electricity per year - around half of Lithuania\u2019s current electricity demand. At least 3% of the farm\u2019s construction work will have to be carried out by small and medium-sized enterprises.<\/p><p>The successful tenderer will be required to contribute at least EUR 5 million to the environmental protection of the Lithuanian maritime area. Once the offshore wind farm is built, the developer will be obliged to make an annual contribution (EUR 1 per 1 MWh of electricity generated) to the communities of municipalities in the vicinity of the farm. Preliminary estimates suggest that this could amount to around EUR 3 million per year.<\/p><p>The area of the Baltic Sea for the second 700 MW offshore wind farm is approximately 136.39 km2. The farm will be about 30 kilometres from the coast.<\/p><p>In line with European practice, the Ministry of Energy is organising preparatory work for the development of an offshore wind farm, as it is a strategically important energy project for the Republic of Lithuania: the engineering infrastructure development plan for the offshore area has already been prepared, the development plan for the connection of the wind farms to the onshore grid is being prepared, the environmental impact assessment of the offshore wind farms is being finalised, the offshore area for the development of the wind farm has been subjected to bottom geophysical and geotechnical surveys, and the wind speeds and other hydrometeorological parameters have been measured. The preparatory work carried out is expected to ensure competitive offers in the tender.<\/p><p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-3391\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-scaled.jpg\" alt=\"\" width=\"2560\" height=\"711\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-scaled.jpg 2560w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-300x83.jpg 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-1024x285.jpg 1024w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-768x213.jpg 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-1536x427.jpg 1536w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-2048x569.jpg 2048w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/02\/LT_00_Fichier-de-reproduction-Next-Generation-EU_POS-18x5.jpg 18w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Sulaukusi Europos Komisijos pritarimo paramos schemai j\u016brini\u0173 elektrini\u0173 pl\u0117trai, po vie\u0161\u0173 konsultacij\u0173 su rinkos dalyviais, Energetikos ministerija si\u016blo antr\u0105j\u012f j\u016bros v\u0117jo elektrini\u0173 parko konkurs\u0105 skelbti 2024 met\u0173 sausio 15 dien\u0105. Energetikos ministerijos pasi\u016blymui dar turi pritarti Vyriausyb\u0117. \u201eJ\u016bros v\u0117jo elektrini\u0173 vystymas \u012fgauna pagreit\u012f ir dedame pamatus antro j\u016bros v\u0117jo elektrini\u0173 konkursui. Siekiame, kad du v\u0117jo [&hellip;]<\/p>","protected":false},"author":4,"featured_media":3672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[],"class_list":["post-4403","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-18"],"_links":{"self":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/comments?post=4403"}],"version-history":[{"count":0,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/4403\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media\/3672"}],"wp:attachment":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media?parent=4403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/categories?post=4403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/tags?post=4403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}