{"id":3512,"date":"2023-03-02T12:10:30","date_gmt":"2023-03-02T09:10:30","guid":{"rendered":"https:\/\/offshorewind.lt\/?p=3512"},"modified":"2023-03-02T12:31:05","modified_gmt":"2023-03-02T09:31:05","slug":"litgrid-skelbia-isankstines-prijungimo-salygas-jurinio-vejo-elektriniu-parkui","status":"publish","type":"post","link":"https:\/\/offshorewind.lt\/en\/litgrid-skelbia-isankstines-prijungimo-salygas-jurinio-vejo-elektriniu-parkui\/","title":{"rendered":"Litgrid announces the preliminary conditions for the connection of offshore wind farms"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"3512\" class=\"elementor elementor-3512\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-7b688159 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7b688159\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9c11249\" data-id=\"9c11249\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-18745d9c elementor-widget elementor-widget-text-editor\" data-id=\"18745d9c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Litgrid announces the preliminary connection conditions for the connection of wind farms in the offshore area (developed with state support (contract for differences (CFD)) to the electricity transmission network.\u00a0<\/strong><\/p><p><span data-contrast=\"auto\">Lithuania's offshore wind farms is one of the most important Lithuanian energy independence projects. It will significantly increase the production of electricity from renewable energy sources, thus reducing Lithuania's dependence on electricity imports and ensuring low electricity prices for residents.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p><p><span data-contrast=\"auto\">The offshore wind farm, which will begin to operate in 2028 in the part of the exclusive economic\nzone of the Republic of Lithuania in the Baltic Sea near Palanga with a capacity of approximately 700\nMW, is expected to generate up to 3 TWh of green electricity per year in the Baltic States, which\nwould meet up to a quarter of Lithuania\u2019s electricity demand. The offshore wind farm is also\nexpected to attract more than EUR 1 billion in investments and create at least 1,300 new jobs. The\narea of the territory planned for the offshore wind farm in the Baltic Sea is approximately 137.5 km 2 .\nThe farm will be about 30 kilometres from the shore.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p><p><a href=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2023\/03\/IPS_JUP-prie-Darbenu-TP-final.pdf\" target=\"_blank\" rel=\"noopener\"><span data-contrast=\"auto\">(TSO) preliminary connection conditions (PDF)<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>\u201eLitgrid\u201c skelbia i\u0161ankstines prijungimo s\u0105lygas v\u0117jo elektrini\u0173 j\u016brin\u0117je teritorijoje, kurios vystomos su valstyb\u0117s parama, prijungimui prie elektros perdavimo tinklo.\u00a0 J\u016brinio v\u0117jo parkai Lietuvoje \u2013 vieni i\u0161 svarbiausi\u0173 \u0161alies energetin\u0117s nepriklausomyb\u0117s projekt\u0173. Jis \u017eenkliai padidins elektros atsinaujinan\u010di\u0173 energijos i\u0161tekli\u0173 gamyb\u0105 ir taip suma\u017eins Lietuvos priklausomyb\u0119 nuo elektros importo bei u\u017etikrins ma\u017eas elektros kainas gyventojams.\u00a0\u00a0 Planuojama, jog [&hellip;]<\/p>","protected":false},"author":4,"featured_media":1745,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[],"class_list":["post-3512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-18"],"_links":{"self":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/3512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/comments?post=3512"}],"version-history":[{"count":0,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/3512\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media\/1745"}],"wp:attachment":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media?parent=3512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/categories?post=3512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/tags?post=3512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}