{"id":249,"date":"2022-03-22T06:49:22","date_gmt":"2022-03-22T03:49:22","guid":{"rendered":"https:\/\/offshorewind.lt\/?p=249"},"modified":"2023-01-09T10:26:41","modified_gmt":"2023-01-09T07:26:41","slug":"susitare-vejo-parkas-baltijos-juroje-bus-30-km-nuo-kranto","status":"publish","type":"post","link":"https:\/\/offshorewind.lt\/en\/susitare-vejo-parkas-baltijos-juroje-bus-30-km-nuo-kranto\/","title":{"rendered":"Consultations with potential developers of a wind farm in the Baltic Sea are starting"},"content":{"rendered":"<p>Energetikos ministerija kovo m\u0117nes\u012f pradeda konsultacijas su potencialiais j\u016brinio v\u0117jo parko Baltijos j\u016broje vystytojais. Konsultacijos bus vykdomos rengiantis v\u0117jo park\u0173 j\u016broje vystytojo atrankos aukcionui, susitikimai su potencialiais investuotojais planuojami iki baland\u017eio 18 dienos.<br><br>It is intended to discuss with potential investors the connection of the wind park to the transmission networks, the connection voltage, the width of the connection corridor and other technical issues of the project, as well as legislative changes related to the implementation of the project, the project calendar and the future construction of the wind park - logistics, material supply issues. Those interested in the implementation of the project and its technical aspects are invited to apply by e-mail. by post <a href=\"mailto:klimato.kaita@enmin.lt\">klimato.kaita@enmin.lt<\/a>.<\/p>\n\n\n\n<p><strong>Information about the offshore wind project in the Baltic Sea<\/strong><br>The public institution Lithuanian Energy Agency, in exercising the powers granted by the Ministry of\nEnergy of the Republic of Lithuania, has assessed the need for mandatory marine surveys and\nThe public institution Lithuanian Energy Agency, in fulfillment of the powers granted by the Ministry of Energy of the Republic of Lithuania, assessed the need for mandatory marine research and actions in the territory of the territorial sea of the Republic of Lithuania and\/or the exclusive economic zone of the Republic of Lithuania in the Baltic Sea, where it is appropriate to organize a tender for the development and operation of power plants using renewable energy resources .development and operation of power plants using renewable energy sources is expedient.<br><br>After clarifying the need and preparing the necessary documents needed to organize the procurement of research and services, the public institution Lithuanian Energy Agency initiated international public procurement related to this project in order to identify service providers who will perform the planned research and services.<br><br><strong>Approved potential territory for the development of renewable energy<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1011\" height=\"706\" src=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2022\/09\/parkas.jpg\" alt=\"\" class=\"wp-image-1701\" srcset=\"https:\/\/offshorewind.lt\/wp-content\/uploads\/2022\/09\/parkas.jpg 1011w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2022\/09\/parkas-300x209.jpg 300w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2022\/09\/parkas-768x536.jpg 768w, https:\/\/offshorewind.lt\/wp-content\/uploads\/2022\/09\/parkas-18x12.jpg 18w\" sizes=\"(max-width: 1011px) 100vw, 1011px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Tasks of the engineering infrastructure development plan:<br><\/strong>\u2022 determine the specific areas where the development and operation of offshore wind farms will be carried out in stages, including the assessment of the current situation and taking into account the implementation of the development of wind farms in stages;<br>preparing the concept (at least two alternatives) for connecting the wind farms to\ntransformer substations in the Baltic Sea (hereinafter referred to as offshore transformer\nsubstations) as well as solutions according to the issued planning conditions, providing\npreliminary locations for connecting the offshore wind farms to offshore transformer\nsubstation cables and offshore transformer substations according to the alternatives\nprepared;<br>detailing the research and concept solutions necessary to carry out field studies for the\ninstallation of offshore transformer substations and connection of the wind farms to the\noffshore transformer substation cables at locations according to the alternatives prepared;<br>within the boundaries of the territory of the engineering infrastructure development plan,\nreserving territories for the boundaries of the wind farms, connection cables,\ncommunication, construction and service corridors, and other infrastructure objects;<br>providing for special conditions for the use of the territory, conditions for the use,\nmanagement and protection of planned territories and the development of activities in\nthose territories, and other requirements;<br>preparing an engineering infrastructure development plan for the development of wind\nfarms in the Baltic Sea with detailed solutions;<br>performing SEA procedures in accordance with the procedure established by the Description\nof the Procedure for the Strategic Environmental Assessment of Plans and Programmes\napproved by Resolution No 967 of 18 August 2004 of the Government of the Republic of\nLithuania on Approval of the Description of the Procedure for the Strategic Environmental\nAssessment of Plans and Programmes.<\/p>\n\n\n\n<p><strong>Environmental impact assessment<\/strong><br>2020\u00a0of the Government of the Republic of Lithuania on\nEstablishing the Parts of the Territorial Sea of the Republic of Lithuania and\/or the Exclusive\nEconomic Zone of the Republic of Lithuania in the Baltic Sea where Organising a Tender\/Tenders for\nthe Development and Operation of Power Plants Using Renewable Energy Sources is Expedient, as\nwell as the Installed Capacities of these Power Plants, it is mandatory to prepare an environmental\nimpact assessment (EIA) programme for the proposed economic activity (PEA), perform EIA procedures, and prepare an EIA report in accordance with the Republic of Lithuania Law on Environmental Impact Assessment of Proposed Economic Activity.<br><br>In 2021, the public institution Lithuanian Energy Agency, in exercising the powers granted by the Ministry of Energy of the Republic of Lithuania, carried out public procurement procedures and identified a qualified provider: V\u0161\u012e Paj\u016brio tyrim\u0173 ir planavimo institutas (Public Institution Coastal Research and Planning Institute), which will carry out environmental impact assessment procedures for the installation and operation of a wind farm with an installed capacity of up to 700 MW<br><br>In the first stage, an EIA programme was prepared, the purpose of which was to provide information\nabout the PEA, its location, nature, capacities and potential impact on the environment, and\naccordingly predict the content, scope and issues of the EIA report.<\/p>\n\n\n\n<p><strong>Geological research of the seabed<\/strong><br>The development of wind power plants in the territorial waters of the Republic of Lithuania in the\nBaltic Sea is intrinsically linked to both the characteristics of the seabed and the geological structure\nof the subsurface. The seabed topography and its geological structure have a special impact on the\nselection of wind power plant construction and foundations, as well as the layout of the\ninfrastructure.<br><br>In order to rationally plan the installation of a wind farm, all potential geological risks must be\nassessed, and any objects on the seabed, such as dangerous debris, unexploded ordnance and so on,\nmust be analysed.<br><br>Vie\u0161oji \u012fstaiga Lietuvos energetikos agent\u016bra, vykdydama Lietuvos Respublikos energetikos ministerijos pavedim\u0105, 2021 m. pareng\u0117 reikalingus dokumentus ir inicijavo vie\u0161\u0105j\u012f tarptautin\u012f pirkim\u0105, siekiant nustatyti teik\u0117j\u0105, kuris atliks geofizinius ir geotechninius j\u016bros dugno tyrimus numatytoje v\u0117jo elektrini\u0173 pl\u0117trai teritorijoje Baltijos j\u016broje. Numatoma, kad atrinktas tiek\u0117jas \u0161iuos tyrimus gal\u0117t\u0173 atlikti per 11 m\u0117nesi\u0173, o j\u0173 rezultatai bus \u017einomi iki 2023 m. vidurio.<br><br>The main meteorological factor that determines favourable conditions for the development of\noffshore wind energy is the wind potential. Wind speed in the territorial waters of Lithuania has not\nbeen measured or studied exhaustively. Wind potential is crucial for developers to select the right\nturbines and calculate the farm&#039;s efficiency.<\/p>\n\n\n\n<p><strong>Wind speed measurements<\/strong><br>Siekiant \u012fvertinti j\u016brinio v\u0117jo potencial\u0105 ir kitus hidrometeorologinius duomenis b\u016bsimo v\u0117jo elektrini\u0173 parko vystymo vietoje Baltijos j\u016broje, vie\u0161oji \u012fstaiga Lietuvos energetikos agent\u016bra, vykdydama Lietuvos Respublikos energetikos ministerijos \u012fgaliojim\u0105, 2021 m. pareng\u0117 reikalingus dokumentus ir inicijavo vie\u0161\u0105j\u012f tarptautin\u012f pirkim\u0105, siekiant nustatyti kompetenting\u0105 teik\u0117j\u0105, kuris atliks v\u0117jo grei\u010dio, vandens ir kit\u0173 meteorologini\u0173 parametr\u0173 matavimus planuojamoje teritorijoje. Numatoma, kad b\u016bsimas teik\u0117jas reikiamus matavimus atliks iki 2023 m. vidurio, t. y. iki numatomo paskelbti konkurso d\u0117l leidimo naudoti j\u016brin\u0119 teritorij\u0105 elektrini\u0173 pl\u0117trai ir paramos.<br><br>Met\u0173 trukm\u0117s matavimus planuojama atlikti dviejose i\u0161 anksto nustatytose teritorijos vietose \u2013 matavim\u0173 stotyse. Matavimai turi b\u016bti atliekami \u012fdiegus nuolatinio steb\u0117jimo, inkaruojamas pl\u016bduriuojan\u010dias stotis su integruota b\u016btina matavimams atlikti \u012franga. Numatomose v\u0117jo grei\u010di\u0173 matavimo sto\u010di\u0173 vietose j\u016bros gylis svyruoja nuo 36 m iki 44 m.<br><br>The data obtained will be used to assess the wind energy potential and the hydrometeorological conditions of the sea at the place in the Baltic Sea where the wind farm is planned to be developed.<\/p>","protected":false},"excerpt":{"rendered":"<p>Energetikos ministerija kovo m\u0117nes\u012f pradeda konsultacijas su potencialiais j\u016brinio v\u0117jo parko Baltijos j\u016broje vystytojais. Konsultacijos bus vykdomos rengiantis v\u0117jo park\u0173 j\u016broje vystytojo atrankos aukcionui, susitikimai su potencialiais investuotojais planuojami iki baland\u017eio 18 dienos. Su potencialiais investuotojais ketinama aptarti v\u0117j\u0173 parko prijungimo prie perdavimo tinkl\u0173, jungties \u012ftampos, jungties koridoriaus plo\u010dio ir kitus techninius projekto klausimus, taip [&hellip;]<\/p>","protected":false},"author":4,"featured_media":1714,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-249","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-17"],"_links":{"self":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/comments?post=249"}],"version-history":[{"count":0,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/posts\/249\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media\/1714"}],"wp:attachment":[{"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/media?parent=249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/categories?post=249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/offshorewind.lt\/en\/wp-json\/wp\/v2\/tags?post=249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}